Smith-Root will be closed 12/24/2024 through 01/03/2025.
Normal business hours will resume 01/06/2025. Happy Holidays!
Granite Reef Dam on the Salt River
Railroad iron electrodes bottom-mounted to concrete deck.- Location: Mesa, Arizona
- Commissioned: 1990
- Type: Waterway
Project description
Blocks upstream migration of Colorado River striped bass and grass carp via the Central Arizona Project canal from entering headwaters of the Salt and Verde Rivers. Site currently in operation and considered 100% effective.
Site characteristics
- Pulsators: 6.0kVA GFFB
- Pulsator Qty: 6