Townshend Dam

Flat bar electrodes mounted in precast Insulcrete base slab and side walls covering an existing weir.
  • Location: Townshend, Vermont
  • Commissioned: 2002
  • Type: Waterway

Project description

Its purpose is to divert upstream migrating Atlantic Salmon into a fish trap for transport over a flood-control dam.

Site characteristics

  • Pulsators: 1.5kVA POW
  • Pulsator Qty: 6